Skip to main content

primer — Evaluation #1

No measurable effect
0.0 pp
pp = percentage points

We ran the measurement. The delta (0.0 pp) is real but can't yet be distinguished from natural variance at this task count. You're protected from acting on noise.

n=5 tasks · 3 runs/config · σ ±0.000 pp

open-bridgeegress opensha256 …@sha256:a0685355n=5×3σ ±0.0 ppGemini (experimental)/gemini-2.5-flash

Metrics

Without0.0%success rate
With0.0%success rate
Variance±0.0 ppmin 0.0% / max 0.0%
Tasks53 runs/config
Cost without≈ $0.0000
Cost with≈ $0.0000
Cost deltaN/Aestimated — provider cost approximate
PRIMER overhead$0.0001

Generation cost (Layer-1 provider). Never included in eval cost delta.

Per-task flips

Fixed by the file 0Broken by the file 0Passed with and without 0Failed with and without 5
  • stub_57fad84178stub_function
    Failed with and without
    0.0% / 0.0%0.0 pp
  • stub_b9274fb078stub_function
    Failed with and without
    0.0% / 0.0%0.0 pp
  • stub_e9b7aa08f6stub_function
    Failed with and without
    0.0% / 0.0%0.0 pp
  • stub_cd25b2a9a2stub_function
    Failed with and without
    0.0% / 0.0%0.0 pp
  • stub_a9e3859795stub_function
    Failed with and without
    0.0% / 0.0%0.0 pp